Traders, Mechanics Raise Concerns Over Odour And Congestion At Achimota Waste Station

Traders, Mechanics Raise Concerns Over Odour And Congestion At Achimota Waste Station
File photo

The reopening of the Achimota Zoompak Waste Transfer Station to support post-flood waste collection is drawing mixed reactions from businesses operating around the facility, as workers complain that the intensified waste disposal exercise is affecting their daily activities.

 

The transfer station was reopened by the government to help manage the large volumes of waste generated after the recent floods, which left heaps of refuse across several parts of Accra.

 

Since resuming operations, the facility has been receiving hundreds of refuse tricycles each day from all over Accra, with many operators spending several hours and days in queues before they are able to offload waste.

 

The increased traffic has led to a noticeable rise in the volume of decomposing waste at the station, producing a persistent odour that mechanics, traders, and transport operators say hangs over the area for most of the day.

 

Many of them say they spend long hours working in the environment and fear the conditions could have implications for their health if they persist.

 

Businesses located around the station say the smell has become one of the biggest challenges since the facility resumed operations, with some of them putting their daily hustles on hold.

 

The traders believe it is discouraging potential customers from spending time in the area, while mechanics say the working environment has become increasingly uncomfortable as waste vehicles continue to arrive throughout the day.

 

Commercial tricycle operators who transport refuse to the station also say congestion remains a major concern.

 

They explain that the long waiting times reduce the number of trips they can make in a day, slowing the overall waste evacuation exercise despite the urgent need to clear refuse from flood-affected communities.

 

Although many of the workers acknowledge the importance of the transfer station in helping authorities manage the aftermath of the floods, they are calling for measures to improve operations.

 

They want authorities to reopen other transfer stations, increase the facility’s capacity, introduce more efficient waste handling systems, and reduce the waiting time for refuse tricycles to minimise congestion and limit the impact on businesses operating nearby.

 

The concerns come as Accra continues efforts to clear waste deposited by the recent floods to prevent secondary public health challenges, including blocked drains, pest infestation, and the spread of disease.

 

Management of the Achimota Zoompak Waste Transfer Station has, however, declined to comment when contacted by 3Music TV, citing the absence of approval from higher authorities.

Comments

MORE FROM
culture

More From 3Music News

Ghana Premier League Champions To Receive GH¢3 Million Prize Money For 2026/27 Season

Ghana Premier League Champions To Receive GH¢3 Million Prize Money For 2026/27 Season

The figure marks a GH¢1 million increase from the GH¢2 million awarded to the champions in the previous season. In addition to the cash prize, the title winners will receive a JAC vehicle valued at $33,000.

GFA Recommends Carlos Queiroz Stay On As Black Stars Coach After 2026 World Cup

GFA Recommends Carlos Queiroz Stay On As Black Stars Coach After 2026 World Cup

GFA Communications Director Henry Asante Twum confirmed that the association’s Executive Council reviewed the 73-year-old coach’s work and agreed he should continue beyond his initial short-term contract.

Yaa Bitha Opens Up About Lifelong Congenital Condition

Yaa Bitha Opens Up About Lifelong Congenital Condition

Bitha described living with a rare congenital defect, identified by viewers and commentators as Müllerian agenesis, also known as MRKH syndrome, that involves the incomplete development of the uterus and upper vagina.

Big Push Road Projects Targeted For Completion By End Of 2027 – Deputy Roads Minister

Big Push Road Projects Targeted For Completion By End Of 2027 – Deputy Roads Minister

Suhuyini said contractors have been given a compressed schedule that is significantly shorter than the typical 36 months required for similar works.

Black Sherif Hosts Intimate London Listening Session

Black Sherif Hosts Intimate London Listening Session

Dubbed An Evening With Black Sherif, the session took place at Xora in London and followed a busy UK run for the artiste, including his appearance at Davido’s Davido & Friends concert at Crystal Palace Bowl on August 14.

Know How To Cross Boundaries - Jerry Ashinyo Tells Comedians

Know How To Cross Boundaries - Jerry Ashinyo Tells Comedians

Jerry said comedians often face criticism when jokes touch on personal, political or cultural issues but believes the way a joke is delivered can determine how audiences receive it.

Jerry Ashinyo Calls For Support For Ghanaian Comedians

Jerry Ashinyo Calls For Support For Ghanaian Comedians

He believes part of the challenge comes from the different forms of comedy Ghanaians have traditionally consumed.

Jerry Ashinyo To Headline ONLY FANS Comedy Special

Jerry Ashinyo To Headline ONLY FANS Comedy Special

He described a comedy special as similar to a music album, with different pieces of comedy brought together into one performance.

Ghanaian Teenager Emmanuel Abrokwa Signs For Sevilla Until 2029

Ghanaian Teenager Emmanuel Abrokwa Signs For Sevilla Until 2029

The talented attacker, a Ghana U19 international, has become the first Ghanaian player in the club’s history and the first to join the La Liga side directly from a Ghana-based club.

No Special Motion Needed For Parliamentary Summons Over Loss Claims - Sammy Gyamfi

No Special Motion Needed For Parliamentary Summons Over Loss Claims - Sammy Gyamfi

Gyamfi said he was ready to respond to claims linking GoldBod to losses recorded under the Bank of Ghana’s Domestic Gold Purchase Programme (DGPP).

AMA Orders Aboboyaa And Tricycles To Install Reflectors, Avoid Major Highways

AMA Orders Aboboyaa And Tricycles To Install Reflectors, Avoid Major Highways

Operators must use available side roads instead of the main carriageways of major highways. Where no side roads exist, vehicles must remain clearly visible through the use of reflectors.

Santasi Drivers Park Vehicles In Protest Over Fare Arrests

Santasi Drivers Park Vehicles In Protest Over Fare Arrests

Drivers say the GH¢1 increase is necessary to offset rising fuel prices and higher operational costs. They note that although the government had proposed a 30 percent fare adjustment, it has not been implemented.

More Similar Videos